This was my first house. I bought it on foreclosure and decided to update it a bit. Kitchen: New counter tops, back splash, dishwasher, refrigerator, gas stove, microwave, sink, and faucet. Living room: New wood floors, paint, trim, crown molding, outlet receptacles and plates, and rail lighting. Bathrooms: New tile throughout, toilets, vanity, mirror, tub, shower head and controls, and taller baseboards. Master Suite: Paint, trim, drywall, ceiling fan, switch receptacles and plates, and plantation blinds Garage/Exterior: New Water Heater, A/C compressor, new furnace coil w/coolant. garage entry door and exterior lighting (some with motion detection) If you have any questions about materials or installation, please leave a comment or message me. Thanks for watching!

Incoming build specific queries:

www recommendedlocal com.

Tagged with: bathroombedroomCONSTRUCTIONdiydo it yourselffaucethome renovationinstallationinteriorkitchenmaster suitepaintremodelrepairsinkwood floors

Filed under: General

Like this post? Subscribe to my RSS feed and get loads more!